Rodong Sinmun
Rodong Sinmun
Aug. 2, 2025 Saturday [Photo]

Increase in Tile Production Witnessed


Officials and working people of the Chollima Tile Factory have produced 600 000 square meters of more tiles since the beginning of this year as against the same period of last year through a 24-7 campaign for increased production.

They, having registered surprising production achievement for the last four years for implementing the five-year plan, buckled down to the campaign for increased production and creation with redoubled passion since early this year.

Workers and technicians of the raw material processing workshops Nos. 1 and 2 highly demonstrated the collectivist spirit to sufficiently supply raw materials needed for the production of various kinds of tiles.

Those of the outer-wall tile workshop examine and repair the equipment in a responsible manner and strictly abide by the technical regulations and requirements of the standard operation method in the operation of equipment, thus producing lots of more tiles than planned.

The counterparts of the inner-wall tile workshop No. 2 closely combine technical studies with production and see to it that they do full justice to the capacity of the newly-arranged third-stage inner-wall tile production line.

At the inner-wall tile workshop No. 1, they make steady efforts to improve the performance of equipment and quality of products.

Several other workshops make high production results day after day through brisk socialist emulations among workshops, work-teams and shifts.


Rodong Sinmun



      
       187 / 461