Rodong Sinmun
Rodong Sinmun
Sep. 1, 2025 Monday [Photo]

Icon Structure of Third-stage Section in Hwasong Area


There are many modern structures in the third-stage section of the Hwasong area.

Among them is the service-amenities-chain built on an overpass which attracts public gaze.

In April last, the respected General Secretary Kim Jong Un visited the third-stage section in the Hwasong area nearing completion.

At that time he learned in detail about the preparations for operating the major neighbourhood-serving amenities built there and highly appreciated that the service-amenities-chain built on an overpass has a strong symbolic and peculiar character and that its design and construction were on a high level as desired by the Party.

Very peculiar is the style of the structure, which depicts the gatepost of the third-stage section in the Hwasong area.

The width of the service-amenities-chain is over 10m and its length over 90m.

The service-amenities-chain on an overpass is in harmony with modern service facilities and dwelling houses and demonstrates the development of the Juche-oriented architecture.


Rodong Sinmun



      
       309 / 663