Production of Custom-built Equipment Needed for Construction of Regional-industry Factories Completed
Ture to the regional development policy of the Workers’ Party of Korea, Kangwon Province has completed successfully the task of producing custom-built equipment to be sent to the regional-industry factories under construction in the province and transported them to relevant units in an intensive way.
The province set detailed production plan of custom-built equipment and conducted the operation and command for realizing it in a bold way.
In particular, the provincial officials of the non-permanent committees for promoting Regional Development 20×10 Policy learned in detail about the production progress on the spot to take positive measures for solving knotty problems while displaying their high sense of responsibility for fully supplying materials necessary for manufacturing equipment.
The provincial equipment assembly enterprise actively developed and introduced new technical innovations by pooling their efforts and wisdom and strictly observed the requirement of technical rules and standard regulations in processing of spare parts, thus completing tens of pieces of custom-built equipment in a short period.
Similar successes have been made in the provincial grain-processing technology development center.
Meanwhile, the province conducted the work to intensively transport the equipment in a responsible manner to the regional-industry factories under construction in Sepho and Cholwon counties.
Rodong Sinmun