Sep. 18,Juche 113 (2024) Wednesday  
Rodong Sinmun
Daily Iron and Steel Production Plan Over-fulfilled

Economy 2024.1.10.


Officials and working class of the metallurgical industry increase the production of Juche iron in high spirit after successfully conducting the first tapping on Jan 1.

Officials of the Ministry of Metal Industry and major metallurgical bases turned out hardening their resolve.

They find out the proper ways to perfect our-style iron production method and realize them in practice while taking measures for providing fuel and raw and other materials.

Furnace men of the Kim Chaek Iron and Steel Complex increase the iron production by displaying the indefatigable fighting spirit.

They intensify the technical study for learning the technical characteristics of the newly-built energy-saving oxygen heat blast furnace and hold enthusiastic discussion on finding out the rational furnace operation method.

Workers and technicians of the oxygen separator branch factory produce quality oxygen needed for the operation of the oxygen heat blast furnaces.

Working class of the Chollima Steel Complex, heightening the enthusiasm for collective emulation, produce more steel than planned by applying a new furnace operation method.

Workers of the Hwanghae Iron and Steel Complex, too, over-fulfill their daily Juche-iron production plan by ensuring full operation of the oxygen heat blast furnace and UHP electric arc furnace.

Thanks to the upsurge of enthusiasm of working class of the metal industrial field, the success in Juche-iron production expands day by day.

Rodong Sinmun