Sep. 20,Juche 113 (2024) Friday  
Rodong Sinmun
On Road for Promoting People’s Wellbeing

Politics 2024.3.30.


To Provide People with All Wealth of Country

 

In September Juche 105(2016), the respected General Secretary Kim Jong Un visited the Ryongaksan Spring Water Factory remodeled as required by the demand of the new era.

He told accompanying officials that the issue of supplying spring water to the people is the issue on the spirit of service to the people, earnestly asking them to do the work responsibly.

That day the General Secretary set forth the task to provide our people with quality spring water.

Remarking that our country has a lot of quality springs, he stressed the need to build spring water factories with the Ryongaksan Spring Water Factory as a model.

He continued that it is a genuine superiority of our socialist system centred on the popular masses to let all the wealth is given to the wellbeing of the people. Provinces should find out the spring water sources and push ahead with the work to modernize the spring water factories, he added.

Indeed, it is the precious instruction of the peerlessly great man who loves the people most.

The respected General Secretary earnestly said that the Party must dynamically propel the work, hygienic circumstances of spring water factories should be ensured and analyze well the spring water to supply clean and safe spring water to the people and the Cabinet must take steps for making provinces, cities and counties find out quality spring waters to provide the people with them.

The officials pictured the slogan "Everything for the people and everything by relying on them!" set forth by the General Secretary who said that we should uphold our people and devote everything to the people as we upheld President Kim Il Sung and Chairman Kim Jong Il.

 

Trial Run Held at Dead of Night

 

It was one November day in Juche 104(2015).

At that time the Kim Jong Thae Electric Locomotive Complex was working hard to perfect the newly manufactured our-style subway train true to the instructions of the General Secretary during his field guidance.

He called an official on the telephone to learn in detail about the trial run of the new subway train.

Not long before, he had inspected the new subway train and stressed the need to ensure the best quality as it would serve our people, repeatedly promising to get on the subway train during its trial run.

Receiving the official’s report that the trial run of the subway train on the ground was well done and they were going to test it underground next day, the General Secretary expressed satisfaction with it. Then he asked the most appropriate time for the trial run.

When the official replied the quiet times in the morning and afternoon, the General Secretary thought for a while. Then he said that he would get on the subway train after the end of the subway operation lest the people feel inconvenience.

Although he was very busy with state affairs, he personally set the time for the trial run lest the people feel any slightest inconvenience.

Therefore, the trial run of the new subway train was conducted in the presence of the respected General Secretary at dead of night of November 19, Juche 104(2015).

Rodong Sinmun